top of page

Camp Kiwanee

Dock Design & Permitting

River Hawk Environmental worked closely with the Town of Hanson to design and permit a new dock at the Camp Kiwanee grounds.

Engineering this project for waterfront access to the pond required the use of cost-effective solutions that will preserve the longevity of the dock while maintaining the natural beauty of the pond.

We work closely with clients on all types of waterfront access projects, providing a product that will meet the client's needs while maintaining compliance with the local municipalities and the state.

Plans and graphics for illustration purposes only.

Back to

LOCATION

Town of Hanson,

Massachusetts

SERVICES

  • Environmental Due Diligence Assessment

  • Environmental Compliance

  • Land Survey

  • Chapter 91 Permitting

  • Municipal Permitting

  • Conservation Permitting

  • Preliminary Survey Layout

WATERBODY

Maquan Pond

bottom of page