Camp Kiwanee

Jun 11, 2024

River Hawk Environmental worked closely with the Town of Hanson to design and permit a new dock at the Camp Kiwanee grounds. Engineering this project for waterfront access to the pond required the use of cost-effective solutions that will preserve the longevity of the dock while maintaining the natural beauty of the pond. We work closely with clients on all types of waterfront access projects, providing a product that will meet the client’s needs while maintaining compliance with the local municipalities and the state.
LOCATION

Town of Hanson, Massachusetts

  • Environmental Due Diligence Assessment
  • Environmental Compliance
  • Land Survey
  • Chapter 91 Permitting
  • Municipal Permitting
  • Conservation Permitting
  • Preliminary Survey Layout
WATERBODY
  • Maquan Pond